ADU cost calculator for builders
A worksheet that sums an ADU budget from your own numbers. Enter your floor area, your own cost per square foot and each line item. PORTREX supplies no prices.
Planning aid only. Not a quote, not an engineering calculation.
Budget sheet
Your budget
Enter your own numbers to see a budget. Nothing is shown until you do.
- Total
- —
- Subtotal
- —
- Contingency
- —
- Cost per square foot
- —
Planning aid only. Not a quote.
Prices shown are preliminary. The contractor may adjust them for changes in costs related to materials, labor, fuel, permitting, regulations, site conditions, professional services, location, or transportation. Final pricing is confirmed after project evaluation and, where applicable, issuance of a Notice to Proceed (NTP).
How builders use this in a proposal
- Fill in the lines with the numbers from your own estimate, then keep the breakdown table beside the proposal draft.
- Show the contingency as its own line so the owner sees which part of the total is a reserve.
- Compare the derived cost per square foot with the rate you quoted at the start, and ask why if they differ.
- Change one input at a time to see how a single line moves the total before you talk to the owner.
What this does not include
- Land or the cost of the lot.
- Financing costs of any kind.
- Local impact fees, unless you enter them under Permits and fees.
- Utility upgrades on the property or in the street, unless you enter them under Utility connections.
- Size limits, setbacks and other rules. These depend on your local ordinance, so check it with your city or county.
Take your numbers into PORTREX
Apply for a trial and PORTREX reviews your application. Your workspace opens after approval, and the 30-day free trial starts when onboarding is complete.